220kV Ben Tre Substation
Project information
Construction: SUPPLY AND INSTALLATION OF 220KV BEN TRE CONSTRUCTION STATION FIRE PROTECTION SYSTEM
Project: STRENGTHENING POWER OF 220KV BEN TRE FROM (125 + 250) MVA STATION TO 2X250 MVA
Contractor: THANH TAO TRADE AND CONSTRUCTION CO., LTD
Construction time: June 22, 2020 -> September 1, 2020
Construction: SUPPLY AND INSTALLATION OF 220KV BEN TRE CONSTRUCTION STATION FIRE PROTECTION SYSTEM
Project: STRENGTHENING POWER OF 220KV BEN TRE FROM (125 + 250) MVA STATION TO 2X250 MVA
Contractor: THANH TAO TRADE AND CONSTRUCTION CO., LTD
Construction time: June 22, 2020 -> September 1, 2020
